• 22597340
  • 87216931
  • This email address is being protected from spambots. You need JavaScript enabled to view it.
  • L-V de 8:00 a.m. a 3:00 p.m.
Technical Report · Environmental Assessment

Environmental Impact Assessment (EIA) in Costa Rica

We integrate the physical, biological and social environments, technical studies and project mapping to identify and assess environmental impacts and define the measures needed to manage them.

Physical environment Land, water, geology and natural hazards
Biological environment Vegetation, habitats, flora and fauna
Social environment People, activities and territorial context
Integrated assessment

Understanding how a project interacts with its surroundings

An Environmental Impact Assessment examines existing conditions, planned activities and the changes a project may cause to different environmental components.

01 · Baseline assessment

Understand the environment

We characterize relevant site and regional conditions before assessing changes that the project may produce.

02 · Interactions

Identify impacts

We link project activities to the environmental components that may be affected.

03 · Management

Define measures

We establish measures and indicators to prevent, mitigate, correct or compensate for impacts, as appropriate.

An EIA is not simply a collection of independent studies. Its value lies in integrating findings from multiple disciplines to understand the project and its environmental interactions as a whole.
Environmental scope

When might an Environmental Impact Assessment be required?

The applicable environmental assessment instrument depends on the project's characteristics, location, applicable thresholds and the significance of the impacts to be evaluated.

Scale Size and magnitude of the proposed activities.
Location Environmental sensitivity and conditions of the surrounding area.
Interactions Number and relevance of the components that could be affected.
Impacts Nature, intensity, extent and manageability of impacts.
You do not need to determine in advance whether your project requires an EIA. We can review its characteristics and provide guidance on the appropriate environmental procedure.
Environmental baseline assessment

A single site encompasses different environmental components

The scope of the baseline assessment is defined by the project's characteristics and the environmental factors that may interact with its activities.

Physical environment

Land, water and natural processes

Geology, soils, landforms, surface water and groundwater, climatic conditions and relevant natural hazards.

Biological environment

Ecosystems, flora and fauna

Vegetation cover, habitats, species and ecological relationships potentially affected by the project.

Social environment

People, activities and territory

Population, land use, nearby activities, social perceptions and the project's relationship with surrounding communities.

Impact assessment

From project activities to their effects on the environment

We identify which actions may cause changes, which components may be affected and the environmental significance of each interaction.

Assessment

Each impact is assessed in relation to the project

01
Activity Identify the action that causes the change.
02
Receptor Determine which component could be affected.
03
Significance Assess the characteristics and significance of the impact.
04
Measure Define how the identified effect should be managed.
Environmental management

Every identified impact should lead to a specific measure

Environmental measures must address the project's actual impacts and be technically compatible with its design, construction and operation.

Prevention

Avoid

Change an activity or decision to prevent the impact from occurring.

Mitigation

Reduce

Reduce the intensity, extent, duration or likelihood of an environmental effect.

Remediation

Restore

Remedy altered conditions and restore environmental functions where technically feasible.

Compensation

Compensate

Establish compensatory measures where impacts remain that cannot be fully avoided or remedied.

Measures must be verifiable. Where appropriate, we include indicators and monitoring mechanisms to verify their implementation and performance.
Spatial analysis

Mapping connects the project to its territory

GIS analysis spatially integrates the Project Area, its Area of Influence, environmental components, restrictions and relevant territorial relationships for impact assessment.

Thematic mapping

Different map layers answer different questions

  • Project Area and infrastructure components.
  • Environmental Area of Influence.
  • Topography and terrain conditions.
  • Hydrography and water resources.
  • Vegetation cover and land use.
  • Infrastructure and accessibility.
  • Restrictions and protected areas.
  • Environmental and social receptors.
Multidisciplinary team

Studies are selected according to the project's needs

Not every EIA requires the same components. Each specialized study is included when it provides information needed to characterize or evaluate an environmental interaction.

Geology

Site Geological Study

Characterization of materials, geomorphology and relevant geological conditions at the site.

Geotechnics

Soil Studies

Properties and geotechnical behavior of materials present at the site.

Groundwater

Hydrogeological Study

Aquifers, groundwater levels, flow direction and relevant hydrogeological conditions.

Surface water

Hydrological Study

Precipitation, runoff, drainage and hydrological behavior in the study area.

Natural hazards

Natural Hazard Assessment

Flooding, mass movements, faulting and other processes that may constrain the project.

Biological environment

Biological Study

Characterization of vegetation cover, habitats, flora, fauna and ecological sensitivity.

Social environment

Social Component

Analysis of population, activities, perceptions and the project's relationship with its human environment.

Heritage

Archaeological Component

Assessment of archaeological heritage where required by the characteristics of the project or site.

GIS

Project Georeferencing

Project geospatial information and preparation of mapping inputs for environmental assessment.

Regulatory application

Environmental Impact Assessment within the SETENA process

An EIA may be the applicable environmental assessment instrument within an Environmental Viability procedure using Form D1.

D1 + EIA

The technical study and the permitting procedure are distinct parts of the same process

This page describes the Environmental Impact Assessment as a multidisciplinary technical deliverable. Submission and management of the Environmental Viability application follow the corresponding procedure before SETENA.

When a project requires D1 + EIA, we coordinate the technical, professional and mapping components needed to prepare the study and environmental application.

Our process

From scope definition to an integrated study

We organize the work so that each discipline addresses a specific question and its findings can be integrated into a single environmental assessment.

01

Review the project

We examine its location, design, activities, background information and general site conditions.

02

Define the scope

We identify the environmental components and technical studies to be developed.

03

Collect information

We integrate background information, fieldwork, specialized studies and thematic maps.

04

Identify impacts

We relate planned actions to environmental components that may be affected.

05

Define measures

We establish the appropriate environmental measures and indicators.

06

Integrate the EIA

We consolidate findings, mapping, assessment matrices, measures and appendices into a coherent technical document.

Deliverables

A study bringing together analysis, mapping and environmental measures

✓
Environmental baseline assessment Characterization of the relevant environmental components in the study area.
✓
Specialized studies Technical components developed according to project scope.
✓
Thematic mapping Spatial representation of the project, environment and area of influence.
✓
Impact assessment Identification and assessment of the main interactions.
✓
Environmental measures Prevention, mitigation, remediation or compensation actions.
✓
Integrated document An EIA organized with its analyses, findings and technical appendices.
Frequently asked questions

Before starting an Environmental Impact Assessment

Do EIA and EsIA mean the same thing?

Both acronyms may be used in everyday Spanish to refer to the Environmental Impact Assessment study. SETENA currently uses the acronym EsIA in its documentation.

Does every project require an EIA?

No. The applicable environmental assessment instrument depends on the project's characteristics, location, thresholds and case-specific evaluation.

Does every EIA require the same studies?

No. The scope depends on environmental components potentially affected and the specific characteristics of the project.

What is the Area of Influence?

It is the geographic area where project-related interactions or impacts may occur. Its delineation must be based on environmental analysis, rather than solely on property boundaries.

Who participates in preparing the study?

Depending on the scope, specialists in geology, hydrogeology, engineering, biology, archaeology, social sciences, mapping and other relevant disciplines may participate.

Does an Environmental Impact Assessment guarantee Environmental Viability approval?

No. The EIA provides technical information for assessing the project. SETENA is responsible for the final decision.

Environmental Impact Assessment

Need an environmental assessment for your project?

We can review your project, its location and available information to define the study scope, required technical components and work strategy.

Geo Costa Rica

Let's review your project

Tell us what you plan to develop, where the project is located and what stage it is at.