Procedures before the MINAE Water Directorate

Water Use Concessions before the Water Directorate

Geo Costa Rica manages water use concession applications before the MINAE Water Directorate in Costa Rica, for both groundwater and surface water. We can also coordinate the technical studies required to assess the source, available flow and the project's actual water needs.

Identify the source Well, spring, river, stream or another available water source
Match availability and demand How much water is available and how much the project actually needs
Apply for the concession Studies, application file and follow-up with the Water Directorate
Right to use water

What is a water use concession?

A water use concession is an authorization through which the MINAE Water Directorate establishes the conditions for legally using a particular water source in Costa Rica.

Source

Where the water comes from

The application must identify the groundwater or surface water source intended for use.

Use

Why the water is needed

The proposed use must be linked to the needs and activities justifying the application.

Flow rate

How much water is requested

The requested flow rate must be supported by the characteristics of the source, demand and applicable technical information.

Geo Costa Rica does not grant water concessions. Geo Costa Rica can prepare and manage the application, undertake or coordinate the required technical studies, and support the client through the administrative process. The MINAE Water Directorate makes the decision.
Using a water source

A concession is required when a project intends to use water from a regulated source

This need may arise when developing a new project, using a well, drawing water from a spring, abstracting water from a river or stream, or incorporating an existing source into the supply system of an activity.

Groundwater

Well

A drilling permit does not, by itself, establish a permanent right to use the water obtained.

Natural discharge

Spring

Using a spring requires consideration of source availability, requested flow rate and intended use.

Surface water

River or stream

The application must account for the specific conditions of the watercourse and proposed abstraction.

Project

New demand

Residential, tourism, agricultural, commercial or industrial activities may require their own water supply source.

Two different pathways

A concession may involve groundwater or surface water

A well, spring and surface watercourse are not assessed in the same way. The water's origin determines the technical information to collect and the most suitable application approach.

Groundwater

Wells

For a new well, the concession is closely linked to the drilling permit, construction results, pumping test and any applicable hydrogeological studies.

View Well Drilling Permits
Surface water

Springs, rivers and streams

The assessment may require direct measurements of source flow, variability, abstraction point conditions and the relationship to project demand.

View Surface Water Sources
Groundwater and surface water applications should not be treated as technically identical. Geo Costa Rica defines the necessary supporting information based on the source type, existing data, intended use and specific project conditions.
The central question

Having a water source is not enough: we need to match the available supply with the project's actual needs

A water use concession application should be based on a technically sound relationship between source availability, its behavior, actual project needs and the requested flow rate.

01

Source

We identify where the water will come from.

02

Availability

We assess what is known about the source's capacity, continuity and behavior.

03

Demand

We determine how much water the planned activity or development actually needs.

04

Application

We relate the technical information to the flow rate requested under the concession.

Availability

How much water can the source provide?

Depending on the source, the answer may require flow measurements, pumping tests, hydrogeological interpretation, background records or other technical assessments.

Demand

How much water does the project need?

Water demand depends on the project's use, scale, occupancy, production, irrigation or commercial, tourism, industrial or agricultural activity.

Surface water sources

A spring, river or stream may vary considerably between the rainy and dry seasons

Direct measurement of a source establishes its flow under the observed conditions. Where seasonal variability is significant, it is also important to understand how the source may behave during less favorable periods.

Dry-season flow measurement

Measuring during lower-flow conditions can provide especially useful information

A measurement taken only during very wet conditions may reflect high availability rather than the source's behavior throughout the year.

Where variability is significant, dry-season measurements can help characterize less favorable conditions. Depending on the study objective, comparing measurements taken on different dates may be advisable.

A single flow measurement represents particular conditions, not the source's entire annual behavior. The number and timing of measurements should be determined by the technical question, expected variability and project requirements.
The study depends on the question

Not all concessions require the same technical studies

The supporting information depends on the source type, requested flow rate, existing records, location, intended use and specific application conditions.

Source and needs

Source and Demand Assessment

Relates the known or investigated capacity of a water source to the project's actual requirements.

View Source and Demand Assessment
Well

Pumping Test

Assesses the hydraulic response of a groundwater abstraction point under controlled pumping.

View Pumping Test
Groundwater

Hydrogeological Study

Interprets aquifer units, flow, water levels, wells and relevant hydrogeological conditions.

View Hydrogeological Study
Water system

Water Balance

Can be used to analyze inflows, outflows, storage and water resource behavior within a defined system.

View Water Balance
Territory

Mapping and Spatial Analysis

Connects the source, properties, abstraction points, infrastructure and other spatial components of the project.

View Mapping and Spatial Analysis
We do not recommend studies simply to increase their number. We first identify the information actually needed for the application, then select the technical study best suited to answer that question.
From demand to application file

How do we manage a new water use concession?

The exact procedure varies according to the source and project conditions, but the technical work can be organized into a logical sequence.

01

Need

We define why water is required.

02

Source

We identify the well, spring or surface water source.

03

Background

We review existing records and the current status of water use.

04

Availability

We determine what needs to be known about the source.

05

Demand

We substantiate the project's water requirements.

06

Studies

We prepare the applicable technical assessments.

07

Application

We prepare and submit the application to the Water Directorate.

08

Admissibility

We address any applicable requests for clarification or corrections.

09

Follow-up

We support subsequent stages of the administrative process.

10

Technical assessment

Relevant information and procedural steps are incorporated into the file.

11

Decision

The Water Directorate decides on the application.

12

Water use

The conditions ultimately authorized must be followed.

Our support does not end when the application is submitted. We can continue reviewing notices, coordinating supplementary information and addressing technical matters arising during the application process.
Groundwater

For a new well, drilling and concession procedures are part of the same pathway

A new well application incorporates the drilling permit and related concession procedures from the beginning. However, obtaining an exploratory drilling permit does not, by itself, establish the right to use the water.

A

Permit

Exploratory drilling is authorized.

B

Drilling

The actual construction characteristics of the well become known.

C

Pumping

The well's hydraulic response is evaluated.

D

Studies

Any additional required technical assessments are submitted.

E

Concession

The conditions for water use are determined.

Coordination between institutions

SETENA environmental approval may also be part of the concession process

Water use concessions are administered by the MINAE Water Directorate. Environmental assessment is a separate procedure, but both should remain technically coordinated when required.

Source

Proposed water use

We define the intended source, its location and the flow rate the project needs.

SETENA

Environmental approval

Environmental documentation must be consistent with the source and proposed water use forming part of the project.

Water Directorate

Concession

The Water Directorate verifies the relevant environmental status under the applicable procedure.

For new wells, this relationship is particularly clear. To proceed with a groundwater concession, the Water Directorate requires the environmental approval associated with the requested concession, clearly identifying the well code.
More than completing a form

Geo Costa Rica combines application management with the studies needed to substantiate it

We can start with the project's water requirements and guide the client through source assessment, technical studies, mapping, application preparation and follow-up with the Water Directorate.

01
Initial review We identify the source, project and current status.
02
Availability We define what information is needed about the source.
03
Demand We relate proposed water use to actual needs.
04
Studies We coordinate flow measurements, hydrogeology, pumping tests or other assessments where appropriate.
05
Mapping We integrate the source, abstraction point, properties and project.
06
Application file We organize the technical and administrative documentation.
07
Follow-up We support the procedure before the Water Directorate.
08
Continuity We advise on subsequent procedures when the project changes.
Application + hydrogeology + water resources + mapping + follow-up. The value of an integrated approach lies in linking these components correctly, rather than treating them as unrelated services.
The process continues after submission

Have you received a request for corrections or additional information from the Water Directorate?

We can review the request, identify what the institution needs and coordinate the technical or documentary response within the agreed scope of services.

Clarifications

Review and supplementation of submitted information.

Corrections

Documentary, mapping or technical adjustments.

Additional studies

Further investigations where genuinely needed.

Follow-up

Incorporating the response into the administrative file.

Before buying

A property with a well, spring or abstraction point is not necessarily ready to supply your project

When water availability affects a property purchase, the technical and administrative status of the source should be reviewed before assuming it can be used under the same conditions in the future.

01
Is there a concession? Review existing water use records.
02
In whose name? Verify the registered concession holder.
03
What flow rate? Check the authorized volume of water use.
04
For what purpose? Compare the authorized use with the new project.
05
Is it still valid? Review its current administrative status.
06
Does the source match? Verify the source associated with the authorization.
A different procedure

If a concession already exists, you may not need to file a new application

An existing concession may require renewal, transfer, a change of use, an adjustment to the authorized flow rate, updated records or other procedures depending on its circumstances.

Expiry

Renewal

When the authorized term ends and water use is to continue under the applicable conditions.

Ownership

Change of holder or transfer

Purchasing the property should not be interpreted as automatically transferring the concession's registered holder.

Project

Change of conditions

A new use, altered flow rate, changed location or other modifications may require a specific procedure.

Did you buy a property whose concession is still registered to the previous owner? Before requesting a new concession, review the existing file and determine the appropriate update or transfer procedure.
Collective water use

Do several property owners or users share the same water source?

For collective water use, it may be necessary to assess how the users, properties, shared infrastructure and concession should be organized.

Water Users' Association

A specific legal arrangement for certain collective water uses

The Water Directorate recognizes Water Users' Associations (Sociedades de Usuarios de Agua) for collective use of water from public-domain sources.

Where this arrangement applies, the association must first be established and registered, followed by the concession application for collective water use.

Frequently asked questions

Water use concessions in Costa Rica

What is a water use concession?

A water use concession establishes the conditions under which a specific water source may be used legally in Costa Rica.

Who grants water use concessions in Costa Rica?

The competent authority for deciding on water use concessions is the MINAE Water Directorate.

Does Geo Costa Rica handle water concession applications before the Water Directorate?

Yes. Geo Costa Rica can manage a concession application before the Water Directorate and coordinate the technical studies required for the source and proposed use.

Who can help me apply for a water concession?

Geo Costa Rica provides technical consultancy and application management, integrating water resources, hydrogeology, mapping and institutional follow-up.

Do I need a concession to use water from a well?

Yes. Groundwater use is subject to a concession. A drilling permit does not replace the authorization to use the water resource.

Can I use the water immediately after drilling a well?

Not automatically. After drilling, the technical documentation, pumping test, applicable studies and required procedural stages must be completed so that the Water Directorate can decide on the conditions of water use.

Can I request a concession to use water from a spring?

Yes. A spring may be covered by a water concession application, subject to assessment of the technical and administrative conditions applicable to the case.

Can I request a concession to use water from a river or stream?

Yes. The Water Directorate provides for concessions involving surface water sources such as rivers and streams. The supporting studies must reflect the source's and project's characteristics.

How do I determine the flow rate I can request?

The requested flow rate must be related to source availability and the project's actual demand. Depending on the case, flow measurements, pumping tests or other technical studies may be necessary.

Why might it be important to measure a spring or stream in the dry season?

Because a measurement taken during very wet conditions can reflect a period of high water availability. A dry-season measurement can provide useful information on source behavior under less favorable conditions.

What studies do I need to apply for a concession?

There is no single package of studies applicable to every concession. The scope depends on source type, flow rate, intended use, location, existing information and specific application conditions.

How long does a water concession take?

A single timeframe would be misleading. The procedure may involve admissibility review, corrections, publication, hearings, technical assessment, inspections and other steps depending on the file.

My concession is about to expire. Do I need to apply for a new one?

Not necessarily. The Water Directorate has a specific process to extend the term when the applicable conditions of water use remain unchanged.

I bought a property and the concession is still in the previous owner's name. What should I do?

Buying the property does not automatically change the concession holder. The administrative file should be reviewed and the relevant transfer or update requested.

I need more water than is currently authorized. Must I request a new concession?

Not necessarily. Changing the authorized flow rate may require a specific procedure and additional technical support depending on the source and circumstances.

I already have a concession, but the project's water use has changed. What is required?

A change in activity or use may require modifying the conditions of an existing concession. The current authorization and the project's new requirements should be reviewed first.

What is your situation?

The next step depends on the water source and current authorization status

New well

I want to develop a new well

The process begins by assessing drilling requirements and the groundwater procedure.

Drilling Permit
Surface water source

I have a spring, river or stream

First, the source, its flow rate and its ability to meet project demand need to be understood.

Surface Water Sources
Existing water use

There is already a well or concession

Start by reviewing existing records, ownership and authorized conditions.

Existing Wells and Water Uses
Institution

I need another water-related procedure

The Water Directorate manages other procedures involving wells, watercourses, discharges and water uses.

View Water Directorate
Water Use Concession · Costa Rica

Do you need to use a water source but are unsure which studies or permits are required?

We can start by reviewing the source, location, water demand and existing records to identify the most suitable approach to the Water Directorate procedure.

To get started

Send us the information you already have

You do not need to know every requirement or the exact name of the technical study in advance.

  • Property location
  • Source type: well, spring, river or stream
  • Intended water use
  • Estimated flow or consumption, if known
  • Existing files, concessions or studies