• 22597340
  • 87216931
  • This email address is being protected from spambots. You need JavaScript enabled to view it.
  • L-V de 8:00 a.m. a 3:00 p.m.
Procedures We Handle

Ministry of Health Procedures

Geo Costa Rica manages procedures and technical requirements before the Ministry of Health relating to sanitation, wastewater, and sanitary compliance for establishments in Costa Rica. We assess the project or establishment, prepare the studies, plans, maps, and documentation within our professional scope, and provide support throughout the corresponding institutional procedure.

Water and Sanitation Treatment systems and subsurface disposal
Sanitary Compliance Orders, emergencies, waste, and cleaning
Technical Support Inspection, documentation, mapping, and follow-up
Two Types of Needs

How Can We Help You with Ministry of Health Procedures?

Our work focuses on two main situations: projects that need to address water and sanitation issues and establishments that need to organize or demonstrate their sanitary compliance.

Project or Development

I need to address sanitation and wastewater

We assess the land, treatment system, final effluent disposal, wells, water bodies, and hydrogeological conditions associated with the sanitary procedure.

Operating Establishment

I need to organize sanitary compliance

We assist with requirements involving Sanitary Orders, emergency preparedness, waste management, and cleaning and disinfection programs.

Projects, Land, and Wastewater

Water and Sanitation Procedures before the Ministry of Health

When a project will use a wastewater treatment system and a specific disposal alternative, the location, terrain, and surrounding environment may be decisive.

Ministry of Health

Wastewater Treatment System Siting Approval

We assess the proposed system location, setbacks, buildings, water bodies, wells, site conditions, and the intended final disposal method for treated effluent.

  • Site and territorial assessment.
  • Proposed system location.
  • Nearby wells and water sources.
  • Technical mapping and documentation.
  • Application management and Ministry follow-up.
Ministry of Health

Subsurface Wastewater Disposal

We evaluate the subsurface disposal alternative considering infiltration, site characteristics, groundwater levels, aquifers, wells, drainage, and applicable hydrogeological conditions.

  • Infiltration tests where applicable.
  • Soil and subsurface conditions.
  • Groundwater table and aquifers.
  • Nearby wells and springs.
  • Technical maps and supporting studies.

A sanitary solution depends on more than the treatment system alone. What happens to treated water after treatment must also be assessed, together with its relationship to the land and water resources.

Operation, Prevention, and Sanitary Compliance

Services for Establishments before the Ministry of Health

Hotels, restaurants, shops, and other establishments may need plans, programs, or corrective measures related to daily operations.

Compliance

Compliance with Sanitary Orders

We review each requirement, inspect the establishment, and organize actions, responsibilities, specialists, evidence, and follow-up within our professional scope.

Preparedness

Emergency Response Plan

Establishment inspection, hazard assessment, evacuation routes, internal organization, procedures, and mapping to support an orderly emergency response.

Waste

Integrated Waste Management Plan (PGIR)

We identify the waste generated by the establishment, where it originates, how it is separated, stored, and transferred, and define objectives, actions, responsibilities, and indicators.

Hygiene

Cleaning and Disinfection Program

We organize areas, surfaces, methods, frequencies, products, responsibilities, and records so the establishment can implement and demonstrate its procedures.

When the Ministry Has Identified a Problem

Have You Received a Sanitary Order?

Do not begin contracting separate solutions before fully understanding what the Ministry of Health has requested.

A single Sanitary Order may contain several different issues requiring distinct actions, responsible parties, and professionals.

Our first task is to turn the document into a clear requirements matrix and determine what can be addressed directly, what requires an inspection, and what calls for another specialist.

  • Full review of the Order.
  • Identification of requirements and deadlines.
  • Establishment inspection where applicable.
  • Definition of corrective actions.
  • Organization of supporting evidence.
  • Coordination with other professionals when needed.
An Establishment Operates as a System

Water, waste, emergencies, and sanitary conditions can be interconnected

Sanitary requirements rarely exist in complete isolation. One condition may affect other areas of an establishment.

Water

Treatment and Disposal

The sanitary system must be considered in relation to the land, drainage, water bodies, and groundwater.

Operations

Waste and Cleaning

The way waste is generated, stored, and handled also affects sanitary conditions.

People

Emergency Preparedness

The building, its routes, equipment, and organization determine how people can respond during an actual event.

That is why we assess the entire problem first. Our goal is to prevent clients from accumulating isolated documents and services that do not solve the underlying issue.

From the Problem to the Application File

How Does Geo Costa Rica Handle a Ministry of Health Procedure?

The specific scope varies by procedure, but we follow a common workflow.

01 · Understand The project, establishment, and requirement.
02 · Review Available documentation and background information.
03 · Inspect The site or establishment, when appropriate.
04 · Assess Technical and site conditions.
05 · Prepare Studies, plans, maps, and documentation.
06 · Coordinate Other professionals when needed.
07 · Manage The application and follow-up within our scope.
08 · Respond To technical comments within our professional competence.
More Than Filling Out Forms

What Does Geo Costa Rica Bring to the Process?

Our value lies in connecting the institutional requirement to the actual site where it needs to be addressed.

Site

Spatial Assessment

We consider properties, buildings, water, drainage, access, hazards, and other site conditions relevant to the procedure.

Technical Expertise

Studies and Documentation

We develop the technical components within our areas of expertise and organize the application file.

Management

Follow-up on the Entire Issue

We work to ensure that studies, documents, actions, and professionals follow a coordinated compliance pathway.

Clearly Defined Responsibilities

Geo Costa Rica prepares and manages; the Ministry of Health assesses and decides

Clear responsibilities help avoid unrealistic expectations.

Geo Costa Rica

Our Role

  • Assess the case.
  • Conduct inspections within the agreed scope.
  • Prepare studies and documentation.
  • Produce maps.
  • Organize application files.
  • Manage the procedure and follow up.
Ministry of Health

Institutional Responsibilities

  • Review the application.
  • Request clarifications where applicable.
  • Conduct inspections within its authority.
  • Assess compliance.
  • Issue official decisions or administrative acts.
Other Professionals

When Another Professional Specialty Is Required

If a component falls under another professional specialty, we identify the need and can coordinate with the appropriate qualified professional without claiming services outside Geo Costa Rica's competence.

No consultant can guarantee the approval of an institutional application. The final decision rests with the Ministry of Health.

Projects and Establishments Across Different Activities

Which Types of Clients May Need These Services?

The scope depends on the project, activity, and specific sanitary requirement.

Hotels and Tourism

Emergency preparedness, waste, cleaning, sanitation, and responses to sanitary requirements.

Restaurants and Food Services

Waste management, cleaning, and other applicable sanitary requirements.

Shops and Services

Plans, programs, and responses to establishment requirements.

Residential Developments

Treatment systems, wastewater disposal, and land conditions.

Condominiums and Projects

Sanitary assessments, treatment infrastructure, and effluent disposal.

Other Establishments

We first review the requirement to determine whether it falls within our services.

Wastewater Procedures Do Not All Follow the Same Institutional Route

Ministry of Health, AyA, or Water Directorate: Which Procedure Applies?

The responsible institution depends on the issue, sanitary system, and final destination of the water.

Ministry of Health

Systems and Sanitary Compliance

This includes the procedures on this page: treatment system siting, subsurface disposal, and sanitary requirements for establishments.

AyA

Sanitary Sewer System

When the procedure concerns service availability or wastewater discharge into a sanitary sewer operated by AyA, a different institutional process applies.

Water Directorate

Discharge into Receiving Water Bodies

When treated wastewater is discharged through an outlet subject to the discharge permit regime, a procedure before the Water Directorate may apply.

If you are unsure which institution is responsible, we can start by identifying the correct process.

Frequently Asked Questions

Questions About Ministry of Health Procedures

Answers for projects and establishments seeking to identify the appropriate sanitary procedure.

Which procedures does Geo Costa Rica manage before the Ministry of Health?

Geo Costa Rica currently works on wastewater treatment system siting approvals, subsurface wastewater disposal, compliance with Sanitary Orders, Emergency Response Plans, Integrated Waste Management Plans, and Cleaning and Disinfection Programs.

Does Geo Costa Rica issue Ministry of Health permits or approvals?

No. Geo Costa Rica prepares studies, plans, maps, documentation, and application files, and handles follow-up within its scope. The Ministry of Health is responsible for assessment and official decisions.

Can Geo Costa Rica help if I receive a Sanitary Order?

Yes. We review each requirement, deadline, and background document; inspect the establishment where applicable; and organize the necessary actions and supporting evidence within our scope.

Can Geo Costa Rica help with requirements related to a Sanitary Operating Permit?

Yes, when the establishment requires technical components within our services, such as plans, programs, sanitation, or responses to specific Ministry requirements.

What is the difference between the Ministry of Health and AyA regarding wastewater?

It depends on the system and where the wastewater goes. The Ministry of Health oversees various sanitary conditions and treatment systems, while AyA handles specific procedures involving its sewer infrastructure.

What is the difference between discharge to a sanitary sewer and a wastewater discharge permit?

They are different procedures. Discharge into a sanitary sewer may be authorized by that network's operator, while discharge into receiving water bodies follows a separate process before the Water Directorate.

Can Geo Costa Rica assess the land before a sanitary system is selected?

Yes. We can assess location, infiltration, groundwater, wells, water bodies, site characteristics, and other conditions relevant to the proposed sanitary solution.

Can I make an inquiry before knowing exactly which procedure I need?

Yes. Many inquiries begin by identifying the appropriate institution, procedure, or study for the project and proposed sanitary solution.

Does Geo Costa Rica work with hotels?

Yes. Hotels may require emergency plans, waste management programs, cleaning and disinfection, sanitation, and responses to sanitary requirements.

Does Geo Costa Rica guarantee approval?

No. We can prepare and technically manage the application within our scope, but the final decision belongs to the responsible institution.

Ministry of Health Procedures

Tell Us What You Need to Resolve

You may have a new project that needs a sanitary solution or an existing establishment that must respond to a Ministry of Health requirement.

We review the issue first to identify the correct procedure, study, plan, or documentation, and which components Geo Costa Rica can prepare.

01
Identify What needs to be resolved.
02
Assess The project, site, or establishment.
03
Prepare Studies, plans, and documentation.
04
Manage Follow-up within our scope.