Water supply and project feasibility

Water Availability for Development Projects

Before developing a property, it is essential to determine where the water will come from, whether there is sufficient capacity to supply the project, and what technical and administrative solution can demonstrate water availability.

NO WATER, NO DEVELOPMENT. A negative response or lack of water utility coverage does not necessarily mean the project is unfeasible. When the existing service cannot meet supply needs, other water sources and self-supply alternatives may be assessed.
A basic condition for development

Water supply determines project feasibility

A property may have a good location, favorable land-use conditions, access and even suitable environmental conditions, but without a viable water supply solution, development may be constrained from its earliest stages.

NO WATER, NO DEVELOPMENT. This is why water availability should be assessed before making major investments, finalizing the design or assuming that a property can accommodate a particular project.
Before purchasing

Does the property have a viable water supply solution?

Reviewing water supply at an early stage helps identify constraints that may affect the property's actual value for the intended development.

Before designing

How much water will the project need?

Demand depends on the number of units, activities, projected population, production processes and operating conditions.

Before applying for permits

How will water supply be demonstrated?

The project must be able to demonstrate a water supply solution compatible with its characteristics and the requirements applicable to its development.

More than finding water

What does water availability actually mean?

The physical presence of water, a distribution network's ability to deliver it, and the legal right to abstract water from a source are related but distinct concepts.

Water resource

Water is present

There may be a nearby distribution network, a well, a spring, a river or another potential source of supply.

Water resource capacity

There is sufficient water

It is necessary to assess whether the source or system has enough water to meet the project's specific demand.

Infrastructure

Water can reach the project

When a utility provider exists, its hydraulic capacity and infrastructure must also be adequate to deliver the service.

Right to use

The resource may be legally used

For a private water source, finding water does not automatically confer the right to use it. The applicable authorizations for water abstraction must also be obtained.

Water availability should be assessed as a combination of source, demand, infrastructure and administrative status. A weakness in any of these components can change the project's water supply strategy.

Identify the water supply pathway

Who can supply water to the project?

The first assessment determines whether a utility provider has the actual capacity to supply the property or whether a self-supply solution must be investigated.

Water utility service

An operator can serve the project

Depending on location, water service may be provided by AyA, an ASADA, a municipality, ESPH or another authorized provider.

  • Identify the operator
  • Projected demand
  • System capacity
  • Project water availability
Private water source

The project needs its own water supply solution

Where there is no effective service coverage or the existing system cannot meet the required demand, private water sources may be assessed according to site and project conditions.

  • Existing wells
  • New groundwater intakes
  • Springs and surface water sources
  • Supplementary sources
Water availability letter or certificate

When a water utility can provide service

Availability must be requested for a specific project. The presence of a nearby pipeline is not enough: expected demand and the system's actual ability to meet it must be assessed.

01

Identify the provider

We determine which entity provides or may provide water service at the project location.

02

Determine demand

The number of units, activities and project characteristics determine how much water is actually required.

03

Apply for confirmation of availability

We prepare the information needed to guide and support the request submitted to the relevant provider.

04

Interpret the response

The response may confirm availability, establish conditions or reveal constraints requiring an alternative water supply strategy.

The water availability letter or certificate is issued by the provider. Geo Costa Rica can help structure the request, assess project requirements and guide next steps based on the response received.
When the conventional route cannot solve the problem

What if the water utility cannot confirm availability?

A negative response or lack of effective coverage does not necessarily mean that no alternative water supply is available to the project.

Capacity

The system has insufficient capacity

Service coverage may exist in the area, but water resources or infrastructure may be insufficient to meet the proposed demand.

Infrastructure

Additional works are required

Some situations depend on network extensions, upgrades or other infrastructure necessary to make water supply possible.

Coverage

No effective service is available at the site

For remote properties or locations outside the network's effective service area, a private water supply source may need to be investigated.

A negative response changes the question

Does the project have no water, or can it simply not obtain water from the existing system?

These are different situations. If the provider cannot meet supply needs, we can assess whether a technically viable alternative exists through a private source.

Look for another solution

Project self-supply

When conventional service cannot meet water needs, private sources may be assessed in light of the site's hydrogeological, territorial and administrative conditions.

Existing source

A well already exists on the property

We review its identification, records, technical condition, capacity and administrative status before assuming that it can supply the new project.

New source

Assess a new well

Aquifer conditions, nearby wells, depth, expected water quality and project demand all form part of assessing a new groundwater intake.

Surface water

Springs, rivers or other sources

Where a surface water source exists, we can assess its flow, behavior, relationship to demand and conditions for potential abstraction.

Finding a water source does not complete the solution. It is also necessary to assess how much water it can provide, its quality and behavior, and the authorizations required to incorporate it lawfully into the project's water supply.
Every project needs a different amount

Availability depends on demand

Water availability cannot be assessed independently of the project. A source that can supply a single home may be insufficient for a larger development.

Home Demand associated with a relatively defined population and use.
Condominium The number of units can significantly increase the required flow rate.
Hotel or commercial development Occupancy, services and operations may generate variable demand throughout the day or year.
Industry or production Water may be directly involved in processes requiring continuous or high flow rates.

This is why we first compare source and demand. This comparison helps determine whether the available alternative can reasonably meet the project's needs or whether other solutions must be considered.

Reduce uncertainty before investing

Check water availability before purchasing or developing

A property's potential depends not only on what can physically be built. It also depends on the existence of a reasonable water supply solution for the proposed activities.

We review

Existing conditions

  • Water provider and known service coverage
  • Existing wells on the property
  • Nearby wells and historical records
  • Springs and surface water sources
  • Identified concessions and water uses
We assess

Potential supply scenarios

  • Water supply through a utility network
  • Known supply constraints
  • Possibility of using an existing source
  • Self-supply alternatives
  • Studies and permits that may be required
A property without a viable water supply solution may require investments, studies and administrative procedures that completely change the project's economic feasibility.
From need to solution

How can Geo Costa Rica help?

Our work is not limited to obtaining a letter. We assess project conditions to identify how water supply needs can be met and which technical or administrative components must be addressed.

01

Understand the project

We identify its location, activity, scale, projected demand and development stage.

02

Identify existing supply options

We review utilities, networks, wells, springs or other sources potentially associated with the property.

03

Request or review availability

We guide the request to the provider and analyze the conditions or limitations of its response.

04

Assess alternatives

Where utility service cannot meet the need, we investigate possible private or supplementary sources.

05

Develop technical studies

We identify the technical studies required to characterize the source and support subsequent decisions.

06

Define the administrative pathway

We integrate the permits, concessions and other procedures applicable to the selected supply solution.

The goal is to reach a useful answer: which source can supply the project, what is still needed to use it, and what technical and administrative steps are required to proceed.

Evidence to support the solution

Related technical studies

Depending on the source and issue to be resolved, various studies may be required to determine the amount of water available and how the source may respond to project demand.

Supply and demand

Water Source and Demand Assessment

Compares project water needs with the capacity of available sources.

Groundwater

Hydrogeological Study

Helps characterize aquifer conditions and address specific questions concerning a groundwater source.

Wells

Pumping Test

Assesses an intake's response and provides information on its behavior during groundwater abstraction.

Surface water

River and Spring Flow Measurement

Measures flow at a surface water source and relates it to project needs.

When the solution involves a private source

Related permits and procedures

If a project needs to develop or use a private water source, specific authorizations may be required depending on the type of intake and water resource involved.

New intake

Well Drilling Permit

The authorization required to drill a new well for groundwater investigation and abstraction.

Water use

Water Concession

Establishes the right to abstract and use water from a source under the conditions authorized for the project.

Drilling and water abstraction are not the same. A drilling permit authorizes development of the well; use of the water resource must also comply with the corresponding authorization.
Water availability for development projects

Before proceeding, determine how your project will obtain water

We can review the location, type of development, projected demand and available sources to guide a supply solution consistent with the project's conditions.

NO WATER, NO DEVELOPMENT. Identifying the problem early makes it possible to assess alternatives before committing further investments.